Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
cuvilliés – Neumayr Design
1.KucheFrontal_edit05
Kitchen glasswork design
2.Kuche-Seitenansicht_edit06
3.KucheArbeitsplatte_edit06
4.Esstisched_edit05
Dining area next to kitchen
5.Badfrontal_edit04
Master bathroom

Cuvilliés

Built in 1904, the renovation of this apartment was difficult, since historical heritage law protected the building. Nothing original could be altered. The existing kitchen and master bathroom were inadequate for today's standards and needed to be relocated. The kitchen was relocated into formal study, and the master bathroom into a former bedroom. A pedestal in the new kitchen and bathroom allowed us to relocate the rooms and install plumbing and electrical without interfering with the protected structure. This also gave us the opportunity to lower the bathtub and create a walk-in shower without threshold. The all-glass shower is a true masterpiece in glasswork.

All Works

aquahaloProduct Design

private wellness pavilionResidential Design

aquamoonProduct Design

villa munichResidential Design

villa munich spaResidential Design

stresemann co 05Furniture Design

stresemann co 1Furniture Design

stresemann i-techFurniture Design

stresemann co 13Furniture Design

hiller gruppeCommercial Design

maltmanResidential Design

numero 6Furniture Design

r1Furniture Design

pia bedFurniture Design

3604 lowry road
los angeles, ca 90027

+1 323 662 9818

â’¸ 2022 Neumayr Design